jjcor
Well-Known Member
I figured maybe a couple of you can answer a few questions about a build with Vik.
1. When my name hits number 19 he said thats when we would figure out the specs and stuff. Does that mean he starts on it right after that? Or do I wait to move further down the list?
2. Do I give my deposit at that time? If so, is it the 600$ or something like 50%?
I would ask Vik but I know he's been busy with the guitar in a week build and figured some of you could probably answer these questions quicker. My number is moving down the list faster than I thought it was going too, so I'm trying to figure everything out. I'll probably be posting here for ideas on specs cause every guitar that he makes I want!
1. When my name hits number 19 he said thats when we would figure out the specs and stuff. Does that mean he starts on it right after that? Or do I wait to move further down the list?
2. Do I give my deposit at that time? If so, is it the 600$ or something like 50%?
I would ask Vik but I know he's been busy with the guitar in a week build and figured some of you could probably answer these questions quicker. My number is moving down the list faster than I thought it was going too, so I'm trying to figure everything out. I'll probably be posting here for ideas on specs cause every guitar that he makes I want!