Just saw this now, sorry for the late reply.
As far as I remember, that was not necessary, as I think there was already a ground wire installed from the bridge. Best way to tell would be to look obviously.
As far as I remember, that was not necessary, as I think there was already a ground wire installed from the bridge. Best way to tell would be to look obviously.